Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-seo-pack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/groupepe/public_html/pse2.ca/wp-includes/functions.php on line 6114
Insulation Coordination Study | PSE2

Insulation Coordination Study

IllustrationThe risk of over voltages – at power frequency or at higher keraunic levels – is present due to switching in an increasingly interconnected network.

These surges can damage equipment or at least reduce their lifetime. An analysis of this type of phenomena will forecast the needs surge or lightning arresters.